Global Settings — Failure Handling

The Settings tab (GravityOps → Asana → Settings) holds plugin-wide options that apply to every feed. Today it covers failure handling: where the “Task Creation Failed” backup task goes when automatic task creation cannot complete.

These options are global on purpose. They are deliberately kept separate from individual feed settings so that a feed whose project or assignee has been deleted (a common cause of failures) cannot also break the safety net meant to catch that failure.


Fallback project #

  • The Asana project the backup Task Creation Failed task is added to.
  • Putting every backup in one fixed project keeps these notices findable instead of floating loose in someone’s task list.
  • Do not point this at a project that a feed actively uses — if that project is the reason a task failed (renamed, deleted, access lost), reusing it would just fail again.
  • If left blank, the backup task is created in the connected account’s workspace without a project.

Fallback assignee #

  • Who the backup task is assigned to.
  • If left blank — or if the chosen user is later removed from the workspace — the backup falls back to the connected Asana user.
  • Assignment is best-effort; the fallback project is what guarantees the task can be found, so set a project even if you leave the assignee blank.

Notes #

  • The dropdowns list the projects and users the connected Asana account can access. Connect on the Connection tab first if the lists are empty.
  • The backup task is created defensively: if the configured project or assignee no longer exists at the time of a failure, the plugin degrades gracefully (connected user, no project) so the notice is never lost.
  • Recent failures are also surfaced in the Asana Integration dashboard widget, and the technical error is recorded on the Gravity Forms entry. See Troubleshooting → Task Creation Failed → Backup Task Behavior.